Estate Outdoor Electrical Plan (San Diego 2026): Subpanels, Circuits, GFCI, and Trench-Once Conduit
Updated February 2026 – San Diego County


On $150k–$800k outdoor rooms, electrical is the #1 hidden failure point. Not because it is “hard,” but because it is often planned last. When electrical is an afterthought, you get: exposed conduit, not enough circuits, nuisance trips, weak Wi-Fi, and cutting finished hardscape to add sleeves later.
This guide is the estate-grade planning checklist you can use with your licensed electrician and your design-build team. It shows what to define in writing: circuit plan, subpanel strategy, trench-once conduit, service access, and documentation before cover-up.
Educational only (not legal advice). Code requirements vary by jurisdiction and project conditions. Always follow the requirements of your local authority having jurisdiction and product listings.
This electrical plan is most valuable when you are building a true outdoor room (cover/pavilion, kitchen, lighting scenes, screens, heaters, A/V, gates).
- Circuit schedule first: list every outdoor system (screens, heaters, lighting scenes, A/V, refrigeration/ice, pumps, gate) and plan circuits intentionally.
- Subpanel strategy early: long runs and many loads often justify a nearby outdoor-room subpanel.
- Trench once: install conduit and sleeves under hardscape before final finishes.
- Service access: junctions, shutoffs, and controls must be reachable without removing stone.
- Outdoor-rated connections: sealed, weather-appropriate boxes and clean routing (no exposed “final” conduit).
- QA photo proof before cover-up: document conduits, trenches, and junction locations so future work is not demolition.
Circuit Schedule: The Table That Prevents Surprises
Most change orders happen because the project has more loads than the original “rough electrical” assumption. Use this table to force clarity with your electrician and your design-build team.
| System | What to define | Why it matters | Related guides |
|---|---|---|---|
| Lighting scenes | Zones, transformers, scene control strategy | Scenes and low-glare planning reduce neighbor issues and improve nightly use | Outdoor Lighting |
| Outdoor room heating | Heater count and zones, control scenes | Under-planned circuits are the #1 heater change order driver | Outdoor Room Heating |
| Motorized screens | Opening schedule, power routing, service access | Screens are expensive to retrofit after finishes | Motorized Screens |
| Outdoor A/V + Wi-Fi | TV location, Cat6 runs, AP location, equipment access | Hardline planning prevents buffering and ugly surface runs | Estate Outdoor A/V |
| Kitchen refrigeration/ice | Dedicated circuits as needed, ventilation, service access | Units fail early when power and ventilation are wrong | Refrigeration & Ice |
| Gate/intercom/cameras | Power + data conduit plan, service access | Future-proofing avoids tearing up entries later | Gates |
Subpanel Strategy: When It Makes Sense
We are not your electrician, but as a planning principle: when you have multiple outdoor systems and long routing distances, a nearby subpanel often makes the system cleaner, more serviceable, and easier to expand. Your licensed electrician should confirm feasibility and code requirements.
- When it helps: multiple heaters, screens, A/V, refrigeration, and lighting scenes in one outdoor room.
- Where it goes: accessible, protected location that stays serviceable and not hidden behind finished stone.
- Why value buyers choose it: fewer “mystery trips,” cleaner routing, easier future upgrades.
GFCI and Outdoor-Rated Install Discipline
Outdoor rooms are moisture environments. The planning goal is simple: outdoor-rated hardware, clean routing, and service access. Your licensed electrician determines the final GFCI and code requirements for your project.
- Serviceable junctions: junctions should be reachable, not buried behind finishes.
- Weather exposure planning: moisture intrusion is a common failure mode for outdoor systems.
- Coordination with cabinetry: outlets and controls must be placed to avoid conflicts with doors, drawers, and appliances.
Conduit and Sleeves: Trench Once, Future-Proof Forever
The most expensive outdoor electrical mistake is cutting finished hardscape to run new conduit. Elite projects install sleeves and conduit under hardscape before final finishes and document it with photos and as-builts.
- Conduit map: routes for lighting, screens, heaters, A/V, and future gate/cameras.
- Sleeves under hardscape: future-proofing for upgrades without demolition.
- Labeling: label at both ends and include an as-built map at closeout.
- QA photo proof: photos before cover-up for every conduit run.
Controls and Scenes: Why Elite Systems Feel “Effortless”
Elite outdoor rooms are not “everything on full.” They are scenes: arrival, dining, lounge, late. This affects circuit planning, transformer planning, and controls.
- Lighting scenes: warm, low-glare, layered.
- Heating scenes: zone-based comfort without blasting the entire space.
- A/V scenes: controlled zones and neighbor-friendly “late mode.”
Permits, HOA, and Inspection Readiness
Electrical scope can trigger permits and inspections depending on jurisdiction and project scope, and HOA review is common in affluent communities for visible exterior changes. Treat electrical as an approvals-aware item early so you don’t redesign later.
Start with: HOA Approval · Kitchen Permits · Historic Review
QA and Documentation: What Value Buyers Demand
- Photo proof before cover-up: conduits, trenches, junctions, and sleeve locations.
- As-built map: conduit routes and labels so future work is simple.
- Panel labels: clear, readable labels that match the outdoor room zones.
Quote Checklist: What to Demand in Writing
This checklist filters out low-quality bids. If it is not written, it is not included.
- Circuit schedule: list of outdoor systems and planned circuits.
- Subpanel strategy: whether a subpanel is included and where it goes.
- Conduit and sleeves: routes under hardscape and future-proofing plan.
- Service access: where junctions and controls are accessible.
- Included trenching LF + overage rules: and restoration scope.
- QA photos before cover-up: required deliverable.
FAQs
Do I need a subpanel for an outdoor room?
Sometimes. It depends on total loads and routing distance. A nearby subpanel can simplify circuits and future upgrades. Your licensed electrician should confirm feasibility and code requirements.
What should be planned before hardscape is installed?
Conduit routes, sleeves, junction locations, and service access. This is the trench-once strategy that prevents cutting finished porcelain or pavers later.
Why do outdoor room projects get electrical change orders?
Because circuits and routing were not defined early. A simple circuit schedule and conduit map prevents most surprises.
Who performs the electrical work?
Electrical work must be performed and permitted by a properly licensed electrical contractor (C-10 or as otherwise allowed by law and the AHJ). This page is planning and coordination guidance only.