Travertine Patio and Fountain, Carmel Valley

Travertine Patio and Fountain, Carmel Valley

This finished project was a $47k-$57k build.

Project Snapshot

Location Carmel Valley, San Diego (92130)
Style Mediterranean
Price Range $47k-$57k

– Pavers: Angelus Courtyard Combo (Standard) 60MM, 1,372 sf, travertine-style light tone
– Polymeric sand: NextGel 50 lb bags (gray), swept into paver joints after installation
– Fountain: custom raised sheer-descent water feature with tiled face, cap, and border
– Sod: tall fescue, 698 sf, includes up to 4-inch soil prep and amendments
– Irrigation: 1 Rain-Bird valve, up to 150 lf Schedule 40 3/4-inch PVC, up to 10 popup sprinkler heads
– Lighting transformer: Pro-Trade TR1 150W stainless steel, 1 unit
– Step lights: Pro-Trade SL1 4.5-inch surface-mounted LED, 6 units
– Ledge lights: Pro-Trade LL2 7-inch bronze LED with stainless steel mounting plate, 2 units
– Smart socket timer: 1 unit
– Low-voltage wire: 12/2, 250 lf roll
– Conduit sleeve: 1-inch standard gray, 42 lf
– Base preparation: compacted aggregate base, 1-inch screeded sand setting bed

– Drainline: 3-inch SDR35, 86 lf total
– Drain caps: 8 plastic square drain caps (3- or 4-inch PVC)
– Grading and compaction performed after demo to establish proper slope
– Surface drainage directed away from the foundation wall (minimum 6-inch fall within the first 10 feet)
– Water line: 56 lf run with spigot to supply the fountain feature

Project window: Dec 12, 2024 to Mar 21, 2025 (67 working days from demo through certificate of completion). Demo completed in the opening week. Paver installation and pool deck work spanned the majority of the schedule, with a two-to-three day polymeric sand cure gate before sod and irrigation work began. Fountain construction overlapped with the paver phase and required separate material delivery coordination, including a delayed pump that arrived after the year-end holiday. Rain-week pauses in early February held off polymeric sand and sod installation. Final lighting installation and walkthrough completed near the end of the build.

Project Story

Overview

A dated backyard at a Carmel Valley home got a full hardscape overhaul: 1,372 square feet of travertine-style pavers, a raised sheer-descent fountain, sod lawn, underground drainage, and step lighting. The crew demoed existing concrete and turf, then rebuilt from the subgrade up.

The Challenge

  • The existing backyard surface was a patchwork of old brick, clay tile, and flagstone set in concrete that had deteriorated around the pool edge, making the space feel neglected.
  • The lawn area had thinning, patchy turf with uneven irrigation coverage that left brown strips across much of the yard.
  • There was no drainage system at all, so surface water from the patio and pool deck had nowhere to go after heavy rain.

What Changed

The finished backyard replaced 680 sf of deteriorated concrete and tile with 1,372 sf of Angelus travertine-style pavers running from the back door across the pool deck in a single continuous field. A central 698 sf tall fescue lawn sits between the paver bands, and the raised sheer-descent fountain runs along the rear hedge as the visual focal point from the house. Six step lights and two ledge lights keep the space usable after dark.

How INSTALL-IT-DIRECT Helped

The homeowner had a clear vision for a clean travertine patio and a water feature, but the existing surface required a full demo before any new work could begin. Install It Direct removed 680 sf of concrete-set hardscape, installed 86 lf of SDR35 drainline with 8 drain caps, and then set 1,372 sf of Angelus Courtyard Combo pavers across the patio and pool deck. The team built a raised sheer-descent fountain along the rear hedge line and finished the turf bed with 698 sf of tall fescue sod and a new irrigation valve. Six Pro-Trade step lights and two ledge lights wired to a 150W transformer lit the finished space after dark. Today the backyard runs from the sliding door to the pool in one continuous paved surface, with the fountain running and the lawn green between the paver bands.

Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.

Design & Build

The Plan

  • Paver selection: Angelus Courtyard Combo (Standard) 60MM in a travertine style, light toned, installed across the patio and pool deck in a single continuous field

  • Fountain design: custom raised sheer-descent water feature, positioned along the rear hedge to create a focal point from the house

  • Drainage: 86 lf of 3-inch SDR35 drainline with 8 plastic drain caps and a new irrigation valve, sloped to meet (6-inch fall in 10 feet away from the foundation)

  • Lighting: 6 Pro-Trade SL1 4.5-inch surface-mounted LED step lights and 2 Pro-Trade LL2 7-inch ledge lights wired under via a 150W stainless steel transformer and smart socket timer

  • Sod zone: 698 sf tall fescue with up to 4-inch soil prep, amendments, and a standard irrigation valve covering up to 150 lf of Schedule 40 3/4-inch PVC with 10 popup heads

  • Electrical conduit: 42 lf of 1-inch gray conduit sleeve run under the paver field to protect low-voltage wire runs

See the 2D plan drawing
Project plan

The Build

Demo and Site Prep

Crew removed 680 sf of brick, clay, tile, and flagstone set in concrete and cleared existing turf. Materials were loaded and hauled off-site. Grading and compacting followed to bring the subgrade to finished elevation.

Drainage and Conduit Rough-In

Underground SDR35 drainline (86 lf) was trenched and connected to 8 drain cap outlets across the patio and pool deck perimeter. Forty-two linear feet of conduit sleeve were laid under the paver field before sand was screeded.

Paver and Pool Deck Installation

Pavers were set on a sand bed across the patio and pool deck, tied into a single continuous surface. Gray NextGel polymeric sand was swept in and allowed a two-to-three day cure before adjacent work resumed.

Fountain Construction

The raised fountain structure was built and tiled, with the cap and borders installed on top. The sheer-descent pump was connected after delivery and the water line was extended 56 lf to serve the feature.

Sod and Irrigation

The central turf bed received soil prep, amendments, and 698 sf of tall fescue sod. The irrigation valve, PVC supply line, and popup heads were installed and balanced across the zone.

Lighting and final checks

Step lights and ledge lights were mounted and wired back to the transformer through the conduit sleeve. The smart socket timer was programmed. A final walk with the homeowner identified any remaining touch-up items.

Investment

What would a similar project cost in San Diego?

Toggle components on/off to estimate your project

Pavers & Hardscape (1,372 sf installed) $11,500 – $14,000
Raised Sheer-Descent Fountain (custom build) $4,000 – $4,500
Demo & Site Work (680 sf concrete/tile removal) $2,000 – $2,500
Sod & Irrigation (698 sf tall fescue + valve) $3,000 – $3,500
Drainage (86 lf SDR35 + 8 caps) $1,000 – $1,500
Lighting (6 step lights, 2 ledge lights, transformer) $1,000 – $1,500
Estimated Total

Frequently Asked Questions

How much does a travertine paver patio with a fountain cost in Carmel Valley San Diego?

Projects similar to this one in the 92130 ZIP typically run $47,000 to $57,000. That range covers 1,300+ sf of paver installation across the patio and pool deck, a custom raised sheer-descent fountain, demo of existing concrete, drainage, sod, and lighting. Fountain scope and pool deck access are the biggest cost drivers on jobs like this.

Do I need a permit for a paver patio or fountain in San Diego?

Paver patios generally do not require a building permit in San Diego as long as drainage is directed away from the foundation. Retaining walls over 3 feet require a permit under San Diego’s local threshold. This project’s fountain is a water feature, not a structural wall, but any gas line connection to an outdoor fire feature would require a separate plumbing permit. Confirm scope details with the City if your project includes walls or gas.

How do I maintain a tall fescue sod lawn next to a pool deck in San Diego?

Tall fescue in a poolside setting benefits from deep, infrequent watering. Adjust controller run-times seasonally to avoid over- or under-watering.

How long does a backyard paver and fountain project take in San Diego?

This project ran from December 12, 2024 to March 21, 2025, 67 working days from demo through the certificate of completion. The paver installation and pool deck work took the bulk of the active install time, with a mandatory two-to-three day cure after polymeric sand before adjacent sod work could begin. Fountain construction ran concurrently and added coordination time for specialty materials, including a pump that was delayed by the year-end holiday. A rain week in early February also pushed sand and sod installation later in the calendar.

What kind of low-voltage lighting works best for a paver patio near a pool?

This project used Pro-Trade SL1 LED step lights flush-mounted into the paver risers and Pro-Trade LL2 ledge lights along the water feature, all wired through a 150W stainless steel transformer. Listing the system as a complete low-voltage assembly and running wire through conduit under the pavers keeps the install code-compliant and protects the wire long-term.

Can a sheer-descent fountain be added to an existing pool deck patio in San Diego?

Yes. This project added a raised sheer-descent fountain to a new paver pool deck during the same build phase. The fountain was built as a custom raised structure with a tiled face, cap, and border, and the water line was extended 56 lf from an existing supply point. Scope, subcontractor coordination, and cure time for the fountain base are the main scheduling factors to plan around.

Your Outdoor Project in 3 Simple Steps

1

Design

We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.

2

Build

Our experienced crews bring the design to life with premium materials and expert craftsmanship.

3

Enjoy

Step into your transformed outdoor space and start making memories with family and friends.

Your Project Manager

Troy MacMillan

Troy MacMillan

A San Diego native with more than 20 years in landscape construction, Troy brings seasoned craftsmanship to every build. A devoted husband and father of two, he carries the same care from the job site to his weekend farm.

Ready to Transform Your Outdoor Space?

Let's discuss your project and bring your vision to life.