Completed backyard porcelain patio and retaining wall project in San Diego.

Collins Ranch Patio Built for Evening Gatherings

This finished project was a $35k-$40k build.

Project Snapshot

Location Collins Ranch, San Diego (92130)
Style Modern
Timeline 10 working days on site (October 13-31, 2025)
Price Range $35k-$40k

MSI Quartz Beige 24×24 porcelain pavers, 943 sf; Mirage UNICO Quarziti bullnose porcelain step, 13 lf; beach-pebble walkway, 162 sf; 14 Pro-Trade PTH1 path lights; Pro-Trade TR1 300W transformer; 12/2 low-voltage wire; smart-socket timer.

Drainage scope included 88 lf of 3-inch SDR35 pipe and five drain-cap or downspout-connection items. Final drainage design, routing, permitting, and code requirements vary by property and jurisdiction.

The scope included a 30 lf 1-inch gas line for the fire-feature area. Gas-line requirements vary by site and jurisdiction.

On site October 13, 2025 to October 31, 2025, 10 working days. Drainage was poured before any pavers were set.

Project Story

Overview

Set 943 sf of MSI Quartz Beige 24x24 pavers across a bare Collins Ranch backyard, anchored by a gas fire pit zone and a 162 sf beach-pebble walkway with a 13 lf porcelain step. An 88 lf SDR35 drain line tied in the downspouts and 14 Pro-Trade path lights extended the yard into the evening, finished in 10 working days.

We use the fire pit almost every evening and the path lights mean nobody trips heading back in., Nicole D., San Diego

The Challenge

  • Bare compacted soil where 943 sf of MSI Quartz Beige 24x24 pavers and a gas fire-pit zone now sit, no patio, no defined gathering point.
  • No exterior lighting existed, so the 14 Pro-Trade PTH1 path lights had to be planned in from the start to make evening use possible.
  • No subsurface drainage path tied the downspouts to a discharge point, requiring 88 lf of SDR35 line to be coordinated with the new pavers.

What Changed

The finished yard now has a 943 sf MSI Quartz Beige paver patio, a curved beach-pebble walkway, a gas fire pit zone, and path lighting. Drainage added 88 lf of SDR35 pipe with downspout connections.

How INSTALL-IT-DIRECT Helped

Install It Direct laid 943 square feet of MSI Quartz Beige porcelain pavers in a 24-by-24 ashlar pattern from the slider to the back fence, set a square gas fire pit off-axis to the house against the planting bed, and routed 88 linear feet of SDR35 drainage with downspout connections under the patio before the first paver was set. Fourteen Pro-Trade PTH1 path lights ran back to a 300W transformer along the perimeter; the beach-pebble walk picks up at the side gate with a continuous metal edge.

Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.

Curved beach-pebble walkway with steel edging winding through the planting beds toward the new paver patio.
Curved beach-pebble walkway with steel edging winding through the planting beds toward the new paver patio.

Design & Build

The Plan

  • 943 sf MSI Quartz Beige 24×24 large-format paver patio across the formerly bare-dirt yard, with an integrated gas fire pit zone sized for hosting.

  • 13 lf Mirage porcelain step transitions the patio level at the door threshold; 162 sf beach-pebble walkway runs alongside as a softer-finish path.

  • Grading pitches the patio surface away from the home, with 88 lf of 3-inch SDR35 drain line tied to downspout connections to carry roof and surface water off the pad.

  • Gas line trenched and stubbed to the fire pit position; 14 Pro-Trade PTH1 path lights on a low-voltage transformer light the patio and walkway after dark.

  • Pavers, decorative rock, and defined hardscape edges replace the lawn-heavy alternative to keep ongoing maintenance low.

See the 2D plan drawing
Project plan

The Build

Demolition and Grading

Crews cleared the bare red-dirt backyard, then cut and compacted the base grade, pitched away from the house, to receive the drain line and the paver field.

Drainage Installation

The crew installed 88 lf of 3-inch SDR35 pipe and tied in the downspouts before any hardscape finish work.

Paver and Step Installation

MSI Quartz Beige 24x24 pavers were installed across 943 sf, with Mirage UNICO Quarziti porcelain bullnose steps set at the transition.

Fire Feature, Lighting, and Walkway

A gas line was run to the fire-pit position, 14 path lights were wired back to the 300W transformer, and the beach-pebble walkway was finished.

Investment

What would a similar project cost in San Diego?

Toggle components on/off to estimate your project

Pavers and hardscape $22,500 – $25,000
Demo and site work $4,000 – $5,000
Drainage, lighting, and fire-feature utilities $8,500 – $10,000
Estimated Total

Frequently Asked Questions

How much did this paver patio and fire pit project cost?

The sold project price was about $32K. The Component Cost Estimator on this page shows the range a similar Carmel Valley build would price at, site access, drainage routing, fire-feature scope, and finish selections explain any gap. A site-specific quote depends on the same factors.

How was drainage handled?

The project added 88 lf of 3-inch SDR35 pipe and tied downspouts into the new drainage scope, all set before the first paver went down. Final drainage design, permitting, and code requirements vary by property and jurisdiction.

How long did this Collins Ranch patio project take on site?

The crew was on site from October 13 to October 31, 2025, 10 working days. The drain line was trenched and set before any pavers went down.

Your Outdoor Project in 3 Simple Steps

1

Design

We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.

2

Build

Our experienced crews bring the design to life with premium materials and expert craftsmanship.

3

Enjoy

Step into your transformed outdoor space and start making memories with family and friends.

Your Project Manager

Patrick Diehl

Patrick Diehl

Born and raised in San Diego, Patrick has managed residential, commercial, and high-rise builds, with a specialty in hardscape. A licensed real-estate agent and certified home inspector, he's committed to delivering every project with quality, compliance, and on-time results.