Wide street-level view of a Bonita front yard with a finished paver driveway and green artificial turf lawn wrapping a palm and agave planting ring.

Paver Driveway & Turf Front Yard, Bonita CA

This finished project was a $20k-$25k build.

Project Snapshot

Location Bonita (91902)
Style Transitional
Timeline About 8 build days
Price Range $20k-$25k

Pavers: Angelus Courtyard Combo (Standard) 60MM interlocking concrete pavers, 533 sf. Turf: SiteOne Turf1 Rye synthetic turf, 72 oz. total weight, 1.5-inch pile height, Olive Green/Tan blades, 926 sf. Infill: SGW Green Sand with antimicrobial, 27 x 50 lb bags. Weed barrier: SGW weed cloth, 6 ft x 250 ft roll. Edging: SGW poly board, 1 in. x 4 in. x 20 ft; 20 linear feet installed.

The driveway and turf areas were graded during base preparation to promote surface runoff away from the home and provide a stable finished surface.

Active field work ran about 8 working days from demolition through finish and cleanup, once the crew and materials were on site.

Project Story

Overview

Set 533 sf of Angelus Courtyard Combo pavers across the Bonita driveway and walkway, then dropped 926 sf of SiteOne Turf1 Rye synthetic turf across the front and side yards. Concrete demo and site prep handled in-house. Eight working days from demo to handoff, with a uniform front-yard surface that resolves the cracked-concrete and patchy-lawn pairing.

Our front yard reads as one piece now instead of three patched-together surfaces., Sandra H., Bonita

The Challenge

  • The existing concrete driveway was worn and visually dated at the front of the property.
  • Patchy natural grass left uneven coverage around the front-yard planting areas.
  • The side yard needed a cleaner, more stable surface for everyday access.

What Changed

533 square feet of Angelus Courtyard Combo interlocking pavers replaced the worn concrete driveway, and 926 square feet of SiteOne Turf1 Rye synthetic turf replaced the patchy natural grass across the front and side yard areas.

How INSTALL-IT-DIRECT Helped

Install It Direct replaced the worn concrete driveway with 533 sf of Angelus Courtyard Combo interlocking pavers and installed 926 sf of SiteOne Turf1 Rye synthetic turf across the front and side yard areas. The finished front yard now combines a defined paver approach, lower-maintenance turf, and a more usable side-yard surface.

Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.

Before & After

Original front entry with a plain straight concrete walkway leading to double doors, flanked by a river-rock bed and existing plantings.
BEFORE

Before: the original straight concrete walkway to the front doors, bordered by river rock and tired front-yard planting.

The curved paver walkway and soldier-course border leading to the front door, new turf lawn to the right.
AFTER

The curved paver walkway and soldier-course border leading to the front door, new turf lawn to the right.

Design & Build

The Plan

  • Paver layout: Angelus Courtyard Combo 60MM units installed across the driveway and entry approach

  • Turf selection: SiteOne Turf1 Rye, 72 oz. total weight, 1.5-inch pile height in Olive Green/Tan blend, selected for a residential front-yard appearance

  • Weed barrier: SGW weed cloth installed across the turf footprint beneath the synthetic surface

  • Infill: SGW Green Sand with antimicrobial treatment, broomed into the turf pile after installation

  • Perimeter: poly board edging installed along turf borders to hold the synthetic surface edge

  • Side-yard finish: synthetic turf continued into the side-yard access area for a consistent, stable surface

See the 2D plan drawing
Project plan

The Build

Demo and Removal

The crew demolished the existing reinforced concrete driveway and removed existing sod and surface materials from the front and side yard areas.

Grading and Base Prep

Subgrade was excavated across the paver and turf footprints. The driveway base was graded and compacted, and bedding sand was screeded across the driveway footprint ahead of paver installation.

Paver Installation

Angelus Courtyard Combo pavers were set across the 533 sf driveway and walkway area, creating a defined hardscape transition between the garage, entry approach, and turf zones.

Turf Installation

SGW weed cloth was laid across the turf zones. SiteOne Turf1 Rye was cut and fitted across the front yard and side yard, with poly board edging and SGW Green Sand infill installed to complete the turf surface.

Finish and Cleanup

The installation was cleaned up, remaining materials were removed, and the finished driveway, entry approach, front turf, and side-yard turf were prepared for regular use.

Project Videos

Finished driveway and turf front-yard walkthrough

Walkthrough of the completed paver driveway, front-yard artificial turf, planting island, paver borders, and finished curb-appeal details.

Investment

What would a similar project cost in Bonita?

Toggle components on/off to estimate your project

Pavers & Hardscape (533 sf driveway and walkway) $6,000 – $7,500
Artificial Turf & Accessories (926 sf) $9,000 – $11,000
Demo, Site Prep & Hauling $4,000 – $5,000
Delivery & Material Logistics $1,000 – $1,500
Estimated Total

Frequently Asked Questions

How much does a paver driveway and artificial turf installation cost in Bonita, CA?

This Bonita paver driveway and turf project is best treated as a roughly $20,000 to $25,000 scope. The final price depends on square footage, concrete removal, site access, base preparation, and selected materials.

What maintenance does synthetic turf require after installation?

SiteOne Turf1 Rye synthetic turf requires no mowing or fertilizing. Occasional rinsing removes dust and debris, and periodic brushing helps keep the blades upright.

How long does it take to replace a concrete driveway with pavers in Bonita?

Active field work on this project ran about 8 working days. Most residential paver driveway and turf projects in the Bonita area take one to two weeks of build time once materials are delivered and the crew starts.

What pavers were used on this Bonita driveway project?

The driveway uses Angelus Courtyard Combo (Standard) 60MM interlocking concrete pavers across the driveway and entry approach.

Can pavers and turf be combined in the same front-yard project?

Yes. This Bonita project combined a paver driveway and entry approach with synthetic turf in the front and side yard areas, creating a cleaner low-maintenance layout from the garage to the planting zones.

Your Outdoor Project in 3 Simple Steps

1

Design

We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.

2

Build

Our experienced crews bring the design to life with premium materials and expert craftsmanship.

3

Enjoy

Step into your transformed outdoor space and start making memories with family and friends.

Your Project Manager

Patrick Diehl

Patrick Diehl

Born and raised in San Diego, Patrick has managed residential, commercial, and high-rise builds, with a specialty in hardscape. A licensed real-estate agent and certified home inspector, he's committed to delivering every project with quality, compliance, and on-time results.

Ready to Transform Your Outdoor Space?

Let's discuss your project and bring your vision to life.