Finished paver walkway and turf walkthrough
Walkthrough of the completed paver walkway, step transitions, artificial turf, river-rock beds, drainage covers, and finished side-yard details.
This finished project was a $17k-$21k build.
A soldier-course paver border meets the existing concrete driveway with a single clean joint.
Fifteen feet of bullnose paver treads handle the grade change between the front yard and the door.
550 sf of SiteOne Turf1 Rye replaces the natural lawn, 1.5" pile, 72 oz, no irrigation.
The walkway continues past the entry, with a river-rock drainage strip separating pavers from the planted edge.
Carried 340 sf of ORCO Mediterranean Express pavers from the property line to the front door, with 15 lf of bullnose treads handling the entry grade change in this Tierrasanta front yard. Replaced the patchy lawn with 550 sf of SiteOne Turf1 Rye and set a beach-pebble border to catch roof runoff before the planted edge. Nine build days from curb to defined route.
Walking up to the front door doesn't feel like an obstacle course anymore., Steve P., San Diego
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
A defined paver walkway runs from the driveway area toward the front entry, replacing scattered concrete stepping stones.
ORCO Mediterranean Express pavers were selected for the walkway and entry approach.
SiteOne Turf1 Rye synthetic turf replaced the existing natural grass area.
A 150 sf beach pebble border frames the turf and hardscape edges.
Imperial Camo Fill infill and 5-inch 40D nails were used for the turf installation.
Existing sod, concrete stepping stones, and mow curb were removed so the front yard could be rebuilt with a cleaner entry layout.
The walkway and turf zones were prepared for new hardscape and synthetic turf installation.
ORCO Mediterranean Express pavers were set for the walkway, with bullnose paver treads used at the front entry steps.
SiteOne Turf1 Rye synthetic turf was installed across the front lawn area, with Imperial Camo Fill infill and a beach pebble border along the edges.
The completed front yard was cleaned up and reviewed at closeout.
Walkthrough of the completed paver walkway, step transitions, artificial turf, river-rock beds, drainage covers, and finished side-yard details.
A front yard scope like this one, with 340 sf of ORCO Mediterranean Express pavers, 15 lf of bullnose step work, 550 sf of SiteOne Turf1 Rye synthetic turf, and a 150 sf beach pebble border, sits inside the $17,000 to $21,000 range. Final pricing depends on square footage, site preparation, materials, and access.
Synthetic turf removes mowing, regular watering, and edging from the front-yard routine. Occasional rinsing and light brushing help clear dust and debris and keep the blades standing upright.
This project was completed over about 9 working days on site. The sequence included sod removal, subgrade preparation, paver and step installation, turf installation, beach pebble placement, and closeout.
Before work begins, homeowners should review site access, drainage expectations, material selections, and any property-specific design review requirements. A contractor can help align the installation scope with local site conditions and the homeowner goals.
Yes. On this Tierrasanta project, the turf field, paver walkway, bullnose step work, and beach pebble border were planned together so the front entry reads as one finished landscape instead of separate materials placed side by side.
The project used ORCO Mediterranean Express interlocking pavers for the walkway and entry approach, paired with SiteOne Turf1 Rye synthetic turf and a beach pebble border.
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Step into your transformed outdoor space and start making memories with family and friends.
Born and raised in San Diego, Patrick has managed residential, commercial, and high-rise builds, with a specialty in hardscape. A licensed real-estate agent and certified home inspector, he's committed to delivering every project with quality, compliance, and on-time results.
Chula Vista
El Cajon
El Cajon
San Diego
Bonita
San Diego
Let's discuss your project and bring your vision to life.
Enter your details below and we'll reach out to schedule your free, no-obligation design consultation. Our projects typically start around $20K. Proudly serving San Diego, California.Free, no-obligation design consultation. Projects typically start around $20K. Serving San Diego.
Install It Direct · on Google · 6,000+ projects built