Eastlake Paver Patio, Walls & Landscape, Chula Vista
This finished project was a $84k-$103k build.
Project Gallery
Project Snapshot
Project Story
Overview
A Chula Vista homeowner in Eastlake replaced an aging concrete driveway and bare yard with 1,835 sf of interlocking pavers, a pergola-covered patio, segmental block walls, a curved front-yard patio, and a full drip irrigation system. Planting beds along the new hardscape received 140-plus plants and bark mulch. Thirteen path lights and 13 uplights now illuminate the property at night.
Install-It-Direct delivered a fully coordinated front-to-back transformation. The crews were professional, communication was excellent, and the outcome exceeded our expectations.
The Challenge
- The front yard had no defined walkway or entry patio, leaving bare dirt and exposed concrete as the only path to the door.
- Standing water drained incorrectly near the house foundation because the existing drain connections were damaged and set too high.
- The backyard under the pergola had no finished surface, so the covered outdoor space could not be used for dining or gathering.
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Design & Build
The Plan
ORCO Holland 4×8 pavers selected for both front and back to tie the property together with a single material running from driveway to rear patio
Circular front-yard patio with soldier-course border flowing into a curved walkway, connected to the existing entry steps with 4 lf of bullnose treads
Rear patio sized to fill the footprint under the existing pergola, with a contrasting soldier-course border and adjacent curved walkway leading to the back of the lot
ORCO AB Country Courtyard Collection segmental walls (80 sf) with 45 AB capstones and 6 post caps to border planting beds and define the edge between hardscape and landscape
Seven-zone Hunter Pro-C drip irrigation system with pressure regulators and up to 15 emitters per zone, feeding 140-plus plants installed in bark-mulched beds
Low-voltage lighting : 1 Pro-Trade 300W transformer, 13 PTH1 path lights along walkways, 13 BUL1 3W uplights on structures and plantings, all on a smart socket timer
See the 2D plan drawing
The Build
Demo and Site Prep
Concrete driveway demolition started first, with a skid steer removing the slab. Root and debris haul-away required four large loads. Excavation under the pergola used temporary wood shoring to protect the existing structure while the base was dug out.
Drainage and Footing Work
After demo, the crew found the existing drainline damaged and too high. Approximately 80 extra linear feet of 3-inch SDR35 pipe was added to reach proper grade. Ten downspout connections were tied in. Wall footings (28 lf, 12x12 inches) were poured before block work began.
Base Preparation
Crusher-run base material was spread and compacted across the driveway, front circular patio, front walkway, rear patio, and rear walkway areas. Two ORCO paver deliveries supplied material to the site, with bedding sand screeded to a consistent 1-inch layer before any pavers were set.
Paver and Wall Installation
ORCO Holland 4x8 pavers went down starting with the rear covered patio, then the rear walkway, driveway, and front areas. Soldier-course borders defined curved edges throughout. The ORCO AB Country Courtyard block wall was built concurrently with paver work, capped with 45 AB capstones and post caps. Bullnose steps were built at the front entry.
Irrigation, Planting, and Mulch
Seven drip zones were installed using Hunter Pro-C and PCM-300 expansion module. Plants were delivered from Terra Bella and KRC Rock. The crew planted 40 one-gallon, 96 five-gallon, 2 fifteen-gallon, and 2 twenty-four-inch-box specimens, followed by 2,000 sf of bark mulch across all planting beds.
Lighting and final checks
Low-voltage wire was run from the Pro-Trade 300W transformer to 13 path lights and 13 uplights. NextGel polymeric sand was applied to all paver joints. A formal punchlist covering scratched or broken paver units and missing joint sand was verified complete before the install was marked finished.
Investment
What would a similar project cost in Chula Vista?
Toggle components on/off to estimate your project
Frequently Asked Questions
How much does a paver patio installation cost in Eastlake, Chula Vista?
A full-property paver project in Eastlake runs roughly $84,000-$103,000 when it covers the driveway, front walkways, rear patio, block walls, drainage, irrigation, planting, and lighting. Paver-only work on a smaller footprint costs considerably less. The 1,835 sf of hardscape on this project accounted for approximately $40,000 of the total budget, with drainage, irrigation, and landscaping adding the rest.
How much maintenance do low-voltage path lights require in a Chula Vista yard?
Very little. The Pro-Trade PTH1 path lights and BUL1 uplights on this project use LED bulbs rated at 2.5W and 3W, so power draw is low and bulb life is long. The smart socket timer handles on/off automatically., the low-voltage system runs through a listed 300W transformer, so there is no high-voltage exposure at the fixtures. Annual checks involve cleaning lens covers, clearing mulch from around stakes, and confirming wire connections at the transformer.
Do I need a permit for a block retaining wall in Chula Vista?
In Chula Vista, the City of San Diego permit threshold of 3 feet (measured from top of footing to top of wall) is the general guide for when a permit is required. The segmental walls on this project were specified at 80 sf of wall face; permit requirements depend on the exposed height and whether surcharge loads like fences or slopes are present. Your contractor should confirm with the local building department based on the final design.
How long does a large paver and landscape project take in Chula Vista?
This project ran approximately 11 weeks from the first demolition day to final punchlist sign-off. The original schedule was about 4 weeks, but a Bobcat breakdown, a wrong-product delivery that had to be refused and rescheduled, and 80 extra feet of drainage work added time. Projects without those complications typically finish closer to the original estimate.
Do ORCO Holland pavers hold up well in Chula Vista's climate?
ORCO Holland 4x8 interlocking concrete pavers are a common choice in San Diego County because they resist UV fading, handle foot traffic and vehicle loads, and can be individually replaced if one unit cracks. This project used them across 1,835 sf from the driveway through the rear patio. NextGel polymeric sand was used to lock the joints and limit weed intrusion.
How does a 7-zone drip irrigation system work for a landscaped yard?
Each drip zone runs a separate group of plants through individual drip lines with pressure regulators and per-plant emitters. The Hunter Pro-C controller on this project manages seven zones, including a PCM-300 expansion module, allowing different watering schedules for different plant types. Each zone covers up to 40 lf of main PVC line, 100 lf of drip tubing, and up to 15 emitters, which is enough to serve several planting beds per zone.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
Your Project Manager
Patrick Diehl
Born and raised in San Diego, Patrick has managed residential, commercial, and high-rise builds, with a specialty in hardscape. A licensed real-estate agent and certified home inspector, he's committed to delivering every project with quality, compliance, and on-time results.
More Projects
More from Patrick Diehl
New Paver Pool Deck, Fletcher Hills, El Cajon
El Cajon
Low-Water Lawn Upgrade in El Cajon
El Cajon
Paver Patio Torrey Highlands, San Diego
San Diego
Poway Backyard Paver Patio with Outdoor Kitchen
Poway
Paver Driveway & Turf Front Yard, Bonita CA
Bonita
A Front Yard, Step by Step, in Tierrasanta
San Diego
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.