Finished turf and retaining wall walkthrough
Walkthrough of the completed artificial turf installation, clean turf-to-concrete transition, edge drain, capped retaining wall, mulch bed, and finished backyard details.
This finished project was a $35k-$40k build.
823 sf of SiteOne Turf1 Rye laid the length of the patio, with the capped Keystone Country Manor wall holding the red-mulch slope along the left.
On a sloped El Cajon backyard in 92019, a failing segmental wall came out. A new Keystone Country Manor course went in on a fresh 93-foot footing, with 823 sf of SiteOne Turf1 Rye, a French drain behind the wall, and an SDR35 surface drain in front. Eight working days from demo to final walk.
The dog has a clean space to run and we use the backyard every day., Emalee P., El Cajon
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Layout centered on a continuous 93 lf segmental wall running along the slope, set on a 12-inch by 12-inch poured concrete footing for long-term stability
ORCO Keystone Country Manor block selected for its weathered-edge, textured-aged finish that blends with the hillside lot character; 93 Country Manor cap units finished the top course
French drain system (93 lf of 3-inch triple-wall perforated pipe with sleeve) installed behind the wall, directing slope water away from the foundation
40 lf of 3-inch SDR35 drain line with three drain caps routed surface water from the turf field to an approved collection point
SiteOne Turf1 Rye (72 oz, 1.5-inch pile, olive green/tan blades) chosen for its pet-appropriate density; Imperial Camofill antimicrobial/pet infill and weed barrier installed per homeowner preference for the household dog
BioBarrier root barrier (10 lf, 18 inches deep) installed along the turf perimeter to prevent future root intrusion
Work began with jackhammer demolition of the existing wall footing and 319 sf of concrete slab. A Bobcat skid steer cleared soil and broke out the old wall. Tree root systems were excavated by hand and hauled off site, with approximately 12 yards of soil removed.
With the yard cleared to subgrade, the crew graded the slope and trenched the wall footing line. A 12-inch by 12-inch concrete footing was poured along the full 93 linear feet of the new wall alignment. Materials were staged and Quikrete mix was brought on site for the footing pour.
Country Manor block was delivered on pallets and set course by course. Geotextile fabric was pinned behind the wall using fiberglass pins. Drainage fabric and the 93 lf perforated French drain pipe were installed behind the wall as courses rose. The top course received 93 Country Manor cap units.
With the wall complete, the crew installed 40 lf of SDR35 drain line across the yard floor with three drain caps at collection points. The turf-to-drain layout was resolved during this phase so the turf field and drain line could work together cleanly.
A compacted aggregate base was prepared across the 823 sf turf field. Weed barrier was laid per the homeowner's preference, then SiteOne Turf1 Rye rolls were cut, seamed with 12-inch seaming tape and SGW glue, and nailed with 5-inch 40D nails. Imperial Camofill antimicrobial pet infill (24 bags) was spread across the finished field. BioBarrier root barrier was installed at the perimeter.
Walkthrough of the completed artificial turf installation, clean turf-to-concrete transition, edge drain, capped retaining wall, mulch bed, and finished backyard details.
Second final-view clip showing the finished artificial turf, retaining wall, concrete edging, flagstone patio edge, mulch planter, and backyard transition details.
Toggle components on/off to estimate your project
A project of this scope in El Cajon, with 208 sf of segmental block wall on a concrete footing, 823 sf of synthetic turf, and full drainage, typically runs $35,000 to $40,000. The biggest cost drivers are wall footing length, how much concrete and old wall must be demolished, and the type of turf infill selected. Pet-grade antimicrobial infill adds cost but is useful for households with dogs.
Retaining wall permit requirements depend on wall height, site conditions, surcharge loads, and local jurisdiction. Homeowners should confirm requirements with the local building department before work begins, especially when a wall supports a fence, driveway, or slope above it.
This project ran about 8 build days across roughly two calendar weeks from demolition through finished turf installation. Footing pours and block installation need sequencing time, and projects with significant tree root removal or soil hauling should budget extra time for site clearing before the wall sequence starts.
This project used SiteOne Turf1 Rye (72 oz, 1.5-inch pile) with Imperial Camofill antimicrobial pet infill and a weed barrier suited for a dog. The antimicrobial infill controls odor, and the heavier 72 oz construction holds up to paw traffic. URINE ZERO concentrate was also included for ongoing maintenance. Weed barrier under pet turf is worth adding since dogs disturb the edges and roots can work through standard landscape fabric over time.
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Step into your transformed outdoor space and start making memories with family and friends.
Born and raised in San Diego, Patrick has managed residential, commercial, and high-rise builds, with a specialty in hardscape. A licensed real-estate agent and certified home inspector, he's committed to delivering every project with quality, compliance, and on-time results.
Chula Vista
El Cajon
El Cajon
San Diego
Bonita
San Diego
Let's discuss your project and bring your vision to life.
Enter your details below and we'll reach out to schedule your free, no-obligation design consultation. Our projects typically start around $20K. Proudly serving San Diego, California.Free, no-obligation design consultation. Projects typically start around $20K. Serving San Diego.
Install It Direct · on Google · 6,000+ projects built