Overview
A Mira Mesa backyard went from overgrown planting beds and a dated fire pit to 1,070 square feet of interlocking pavers and 898 square feet of artificial turf. The crew removed an existing fire pit and seat wall, extended drainage to over 90 linear feet, and built a curved turf island with a soldier-course paver border. The yard now has distinct areas for outdoor dining, lawn use, and a built-in grill island.
The Challenge
- Water pooled in the backyard during rain because the existing drainage was inadequate, and a collapsed drain section left part of the yard with no functioning outlet.
- The existing fire pit, seat wall, and overgrown planting beds left the backyard with no usable flat lawn area or defined outdoor living space.
- Muddy bare soil and scattered rock made the yard difficult to maintain and uncomfortable to use between the house and the rear fence line.
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Design & Build
The Plan
Layout: curved artificial turf island centered in the backyard, surrounded by interlocking pavers; a separate paver walkway connects the side yard to the main patio
Pavers: ORCO Villa Express in a field-and-border pattern with a gray soldier-course edge; NextGel polymeric sand (gray) swept into joints for weed resistance and stability
Turf: Imperial Desert Rye Premium (898 sf) installed over SGW weed cloth, secured with 5-inch Imperial nails and infilled with Imperial Camo Fill; 130 lf concrete mow strip separates turf from paver field
Drainage: 60+ lf of 3-inch SDR35 drain line across two change-order phases, 5 PVC elbows and 5 wyes/tees, 6 drain caps/downspout connections; system sloped away from foundation; plumber engaged to confirm outlet destination before final backfill
Demo and site prep: demolition of existing fire pit (gas line removed), two seat wall sections (~41.6 sf), plant and rock removal, concrete sawcut (12 lf), and bobcat grading; backyard access hauled through side gate
Conduit: 40 lf of 1-inch gray conduit installed under pavers for future low-voltage wiring (NEC Article 411 compliant pathway)
See the 2D plan drawing
The Build
Demo and Site Prep
Demo started with the homeowner having pre-cleared most vegetation. The crew demolished two seat wall sections totaling approximately 41.6 sf, broke out the existing fire pit and capped the gas line, sawcut 12 lf of concrete, and removed plant material and rock. Concrete was found thicker than planned, which the project manager documented on site. All debris hauled through the side gate.
Drainage Rough-In
Initial drainage layout placed 30 lf of 3-inch SDR35 pipe in the backyard. A collapsed existing drain section discovered by the plumber required extending drainage an additional 30 lf into the front yard. A second drainage run was later found to have been buried under base material before testing; the crew excavated, retested, and reburied with sign-off. All drainage lines were tested and inspected before final backfill, with a licensed plumber signing off on the outlet connection. Five PVC elbows and five wyes/tees connected the runs; six drain caps were set at collection points.
Base Prep and Conduit
After grading, the crew placed and compacted the crushed aggregate base across the full 1,070 sf paver footprint. Forty linear feet of 1-inch gray conduit were laid under the base for future low-voltage wiring. Sand bedding was screeded level before any pavers were set.
Paver Installation
ORCO Villa Express pavers were installed field-first, with a gray soldier-course border set in concrete along perimeter edges. The layout and border alignment were walked and approved by the homeowner on site before field paving continued. Pavers under the covered deck area were installed last. A 24.5 sf concrete pad was poured for the grill island base.
Turf and Mow Strip
SGW weed cloth went down across the 898 sf turf zone. Imperial Desert Rye Premium was cut to fit the curved layout, secured with 5-inch nails, seamed, and infilled with Imperial Camo Fill. The 130 lf concrete mow strip was set to create a clean separation between turf and pavers. A narrow planting bed along one fence line received shredded fir mulch (120 sf) over landscape fabric.
Plumbing Final and Closeout
A licensed plumber confirmed the drain outlet destination and completed final glue and cure before the final walk. Irrigation and drainage were retested at the homeowner's request following bobcat work. The side gate was reattached, the site was swept, and pallet pickup was coordinated with ORCO.
Investment
What would a similar project cost in San Diego?
Toggle components on/off to estimate your project
Frequently Asked Questions
How much does a paver patio and artificial turf backyard cost in Mira Mesa San Diego?
This Mira Mesa project, covering 1,070 sf of interlocking pavers and 898 sf of artificial turf with full drainage, came in around $38,000-$40,000. A similar scope in San Diego typically runs $35,000-$44,000 depending on drainage complexity, backyard access, and how much demo is required. Projects with limited access or significant drainage work will land at the higher end.
Do I need a permit for a paver patio or artificial turf in San Diego?
Paver patios and artificial turf typically do not require a building permit in San Diego. Retaining walls under 3 feet (measured from top of footing to top of wall) also fall below the permit threshold per San Diego Municipal Code. This project removed an existing gas line for the fire pit, which involved a licensed plumber and appropriate coordination. If your project includes a new gas line, a permit is required.
Can my HOA in Mira Mesa prohibit artificial turf?
No. California Civil Code Section 4735 makes HOA provisions that prohibit synthetic turf void and unenforceable. An HOA may set reasonable quality and appearance standards, such as pile height or color requirements, but cannot ban turf outright. If your HOA has pushed back, the state law overrides those CC&R provisions.
Does artificial turf require maintenance in Mira Mesa?
Imperial Desert Rye Premium turf requires very little upkeep. Rinse off debris periodically, brush the pile upright once or twice a year, and check that drain caps stay clear. Unlike natural lawn, there is no irrigation, mowing, or fertilizing. The Camo Fill infill settles over time and may need topping off after the first year.
How long does a backyard paver and turf installation take in San Diego?
This project took approximately six weeks from demo to final walkthrough. That includes tearing out existing walls and a fire pit, expanding drainage, installing 1,070 sf of pavers, and laying 898 sf of artificial turf. Projects with unexpected drainage issues, as this one had, can add a week or two to the schedule.
What pavers were used in this Mira Mesa backyard project?
ORCO Villa Express pavers were installed across the 1,070 sf field. A contrasting gray soldier-course border was set in concrete along the perimeter and around the curved turf island. NextGel polymeric sand (gray) was used to lock the joints. ORCO Villa Express is a multi-piece modular system that produces a varied, natural-looking surface without a repetitive grid pattern.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
Your Project Manager
Troy MacMillan
A San Diego native with more than 20 years in landscape construction, Troy brings seasoned craftsmanship to every build. A devoted husband and father of two, he carries the same care from the job site to his weekend farm.
More Projects
More from Troy MacMillan
New Paver Patio in Rancho Del Oro, Oceanside
Oceanside
Bostonia Backyard Rebuilt in Pavers and Turf, El Cajon
El Cajon
Turf, River Rock & Pavers: Carlsbad Front Yard
Carlsbad
Oceanside Paver Driveway, Turf Grid, and Front Entry Remodel
Oceanside
Mixed Angelus Pavers with Stone Pillars in Vista
Vista
Paver-and-Turf Grid Backyard in Vista
Vista
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.