Finished backyard showing new interlocking paver patio and walkway surrounding an installed artificial turf lawn. San Diego project by Install It Direct.

Modern Family Courtyard in Torrey Del Mar, San Diego

This finished project was a $29k–$37k build.

Project Snapshot

Location Torrey Del Mar, San Diego (92130)
Style Modern
Timeline About 5 weeks
Price Range $29k–$37k

• 652 sf Belgard Dimensions 12×24 pavers
• NextGel polymeric sand (ivory) for joint stabilization
• 304 sf Mission Mountain cobble (3/4-inch)
• 13 LF paver steps with riser and tread
• 12 Pro-Trade PTH1 path lights (15-inch riser, bronze, 2.5W 2700K LED)
• 2 Pro-Trade BUL1 up lights (bronze housing, 3W 2700K LED, 38-degree beam)
• 300W stainless steel Pro-Trade TR1 transformer
• Smart socket timer for automated lighting control

Comprehensive stormwater management with 3-foot channel drain at garage door, 65 LF of 3-inch SDR35 pipe connecting downspouts and surface drains to bio retention pit. System designed with proper fall per CRC R401.3 requirements. Five drain caps installed for maintenance access.

Gas line work required simple MEP permit for 1-inch line installation with tracer wire and manual shutoff valve. Material staging completed on client property with signed release form. DIG ALERT completed before excavation.

Project completed in approximately 5 weeks from install start to final walk. Initial client concerns about timeline resolved through site visit and communication. Phased approach allowed for drainage solution verification before paver installation.

Project Story

Overview

IID transformed a backyard with drainage issues into a 652 sf paver patio featuring a gas fire pit, comprehensive drainage system, and 14 landscape lights, completed over 5 weeks despite early challenges.

The Challenge

  • Water pooled at the garage door entrance after every rain event, threatening to seep inside the home
  • The backyard was mostly bare dirt with no usable space for outdoor entertaining or family activities
  • Existing drainage patterns directed water toward the foundation rather than away from the home

What Changed

The transformation eliminated standing water issues and created a 652 sf modern patio with gas fire pit centerpiece. Mission Mountain cobble pathways and 14 landscape lights extended the usable space through multiple zones while the bio retention system properly manages stormwater away from the foundation.

How INSTALL-IT-DIRECT Helped

The homeowner faced a backyard that was both unusable and problematic, standing water at the garage entrance and bare dirt throughout. IID designed a comprehensive solution combining a 652 sf Belgard Dimensions paver patio with an integrated drainage system. The design featured a 3-foot channel drain at the garage door, 65 feet of 3-inch drain pipe, and a bio retention pit to handle stormwater properly. A gas fire pit became the centerpiece, surrounded by Mission Mountain cobble accents and lit by 14 landscape lights. Now the family has evening gatherings around the fire pit, the path lights guide them safely after dark, and the large paver surface stays dry and clean for outdoor dining.

Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.

Light-colored rectangular interlocking pavers installed in a staggered/running bond pattern forming a patio or walkway adjacent to a planted mulch bed. San Diego project by Install It Direct.

Design & Build

The Plan

  • Layout strategy: Central fire pit on 652 sf paver field with Mission Mountain cobble accent areas and stepping stone pathways to side access

  • Materials: Belgard Dimensions 12×24 pavers for clean modern lines, NextGel polymeric sand in ivory, Mission Mountain 3/4-inch cobble for texture contrast

  • Drainage design: 3-foot channel drain at garage door connected to 65 LF of 3-inch SDR35 pipe discharging to bio retention pit per CRC R401.3

  • Lighting plan: 12 Pro-Trade PTH1 path lights and 2 Pro-Trade BUL1 up lights on 300W transformer with smart timer control

  • Gas coordination: 25 LF of 1-inch gas line with tracer wire, manual shutoff valve, and two gas connections for fire feature

The Build

Phasing

Demo and site clearing, drainage system installation, excavation to 7.5-inch depth for paver areas, base preparation and compaction, paver installation with polymeric sand, lighting and gas rough-in, cobble installation, final cleanup and testing

Key Inspections

Excavation depth verification (7.5 inches for patio areas), base compaction to 98% Standard Proctor, sprinkler system leak testing before and after installation, gas line pressure testing, drainage flow testing

Utilities

3-inch SDR35 drain pipe with 5 drain caps, 25 LF 1-inch gas line with sweep connections, 44 LF electrical conduit for 12/2 low-voltage wire, 1-inch screeded sand bed over compacted base

Investment

What would a similar project cost in San Diego?

Toggle components on/off to estimate your project

Pavers & Installation (652 sf) $12,500 – $15,000
Drainage System $4,000 – $4,500
Landscape Lighting (14 fixtures) $4,000 – $4,500
Gas Fire Feature $3,000 – $3,500
Cobble & Steps $5,000 – $6,000
Demo & Site Work $3,000 – $3,500
Estimated Total

Frequently Asked Questions

How much does a paver patio with fire pit cost in San Diego?

This Torrey Del Mar project with 652 sf of Belgard Dimensions pavers, gas fire pit, comprehensive drainage, and 14 landscape lights was in the $29,000-$37,000 range. Costs vary based on total area, drainage complexity, gas line requirements, and material selections.

Do you need permits for gas fire pits in San Diego?

Yes, this project required a simple MEP permit for the 25-foot gas line installation. The gas line included proper tracer wire, manual shutoff valve, and pressure testing. Gas work must be performed by licensed professionals and inspected before backfilling.

What maintenance do Belgard Dimensions pavers require?

The NextGel polymeric sand used in this project provides excellent joint stability and weed resistance. Annual power washing and occasional sand topping maintains the clean appearance. The large 12x24 format means fewer joints to maintain compared to smaller pavers.

How long does a backyard paver installation take?

This project took about 5 weeks from start to completion, including time for drainage system installation and gas line work. Timeline included addressing initial client concerns through site visits and phased construction approach.

Your Outdoor Project in 3 Simple Steps

1

Design

We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.

2

Build

Our experienced crews bring the design to life with premium materials and expert craftsmanship.

3

Enjoy

Step into your transformed outdoor space and start making memories with family and friends.

Your Project Manager

Patrick Diehl

Patrick Diehl managed this complex drainage and hardscape project with careful attention to the homeowner's concerns and technical challenges, ensuring proper water management while creating a beautiful outdoor living space.

Ready to Transform Your Outdoor Space?

Let's discuss your project and bring your vision to life.