Multi-Zone Family Oasis in San Marcos Highlands
This finished project was a $41k–$51k build.
Project Gallery
Finished backyard installation showing a paved patio with interlocking pavers adjacent to newly installed artificial turf. San Marcos project by Install It Direct.
Finished interlocking paver patio transitions into a newly installed artificial turf lawn with a smooth curved edge. San Marcos project by Install It Direct.
Finished interlocking paver patio with a curved paver edge flowing into a newly installed artificial turf lawn; stepping stones provide access across the turf to the HVAC unit at the house exterior. San Marcos project by Install It Direct.
Narrow residential side yard showing a completed interlocking paver walkway with a central strip of artificial turf and concrete stepping pads. San Marcos project by Install It Direct.
Narrow interlocking paver walkway installed between a concrete driveway and a mulch planting bed at a residential frontage. San Marcos project by Install It Direct.
Completed paver walkway and adjoining segmental retaining wall with a soldier-course edge and curved paver banding next to a mulched planting bed. San Marcos project by Install It Direct.
See 3 more photos
A narrow interlocking paver walkway runs between a concrete driveway and a mulch planting bed with succulents. San Marcos project by Install It Direct.
Narrow side-yard paved walkway installed with interlocking concrete pavers in an ashlar-like pattern between a segmental retaining wall and the home's stucco exterior. San Marcos project by Install It Direct.
Project Snapshot
Project Story
Overview
IID transformed a bare dirt backyard into a 868 sq ft Angelus paver patio with 518 sq ft of Imperial Desert Rye artificial turf, Angelus Rustic Wall, and Pro-Trade LED lighting , completed in 16 build days over 2.5 weeks.
The Challenge
- The backyard was mostly bare compacted soil with scattered potted plants, making it unusable for family activities or entertaining
- Water pooled in low areas after rain events due to poor drainage and lack of proper grading
- The existing low retaining wall was deteriorating and limited the usable space layout
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Before & After
Design & Build
The Plan
Layout strategy: Created distinct zones with paver patio as main entertaining area, turf sections for softer use, stepping stone pathways for circulation
Materials: Angelus Courtyard Combo 60mm pavers in modular pattern with NextGel Polymeric Sand, Imperial Desert Rye artificial turf, Angelus Rustic Wall blocks
Drainage: 58 LF of 3-inch SDR35 drainline with 8 drain caps, 20 LF French drain behind retaining wall, graded to direct water away from structures
Lighting: 9 Pro-Trade LED fixtures (4 ledge lights, 5 step lights) with 150W transformer and 500 LF of 12/2 wire for evening use and safety
Coordination: Material staging area secured with client release due to narrow access, utility protection measures for existing systems
See the 2D plan drawing
The Build
Phasing
Demo and excavation started Day 1, followed by base preparation and compaction Days 2-3, paver installation Days 4-6, wall reconstruction and turf installation Days 7-10, lighting and final grading Days 11-14, punch list and completion Days 15-16
Key Inspections
Pre-construction sprinkler system testing, subgrade compaction verification, base material approval before screeding, drainage system testing before backfill, final paver joint and lighting inspection
Utilities
3-inch SDR35 drainage pipe with Schedule 40 PVC fittings, 8 plastic drain caps for surface collection, 20 LF perforated pipe French drain system, 12/2 low-voltage lighting wire buried 6 inches per NEC requirements
Investment
What would a similar project cost in San Marcos?
Toggle components on/off to estimate your project
Frequently Asked Questions
How much does a paver patio with artificial turf cost in San Marcos?
This 868 sq ft paver patio with 518 sq ft artificial turf project invested $41,000-$51,000. Costs vary based on paver selection, drainage requirements, wall work, and site access. Angelus Courtyard Combo pavers with comprehensive drainage and lighting systems represent the higher end of residential paver installations.
Do paver patios require permits in San Marcos?
Paver patios at grade typically don't require building permits. However, this project included retaining wall work and drainage modifications which may trigger permit requirements. Gas line installations always require MEP permits. IID handles all permitting requirements during the planning phase.
What drainage considerations are important for backyard hardscape?
This project included 78 total linear feet of drainage systems (58 LF SDR35 pipe plus 20 LF French drain) to handle San Marcos soil conditions. All grading complies with CRC R401.3 requirements for water management away from structures. Proper drainage prevents standing water and foundation issues.
How long does paver and turf installation take?
This project took 16 active build days over 2.5 weeks. Timeline depends on scope complexity, weather, and inspection schedules. The combination of pavers, retaining wall reconstruction, comprehensive drainage, and lighting installation requires careful sequencing for quality results.
How does artificial turf perform with San Diego weather?
Imperial Desert Rye 65 artificial turf is designed for San Diego's climate with UV-resistant fibers and drainage backing. The 550 bags of silica sand infill provide ballast and cooling. This installation included proper edge restraints and 6-inch base preparation for long-term performance.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
Your Project Manager
Troy MacMillan
Install It Direct specializes in comprehensive outdoor living solutions that combine hardscape, drainage, and lighting into cohesive designs. Our San Marcos projects demonstrate expertise in managing complex site challenges while delivering functional family spaces.
More Projects
More from Troy MacMillan
Eastlake Front and Side Yard: Turf, Rock and a Refreshed Planter
Chula Vista
Vista Front Yard with a Putting Green and Belgard Pavers
Vista
Front Yard Pavers, Steps and a Rebuilt Rustic Wall in San Diego
San Diego
Worn Concrete Replaced with Angelus Pavers in San Diego
San Diego
New Paver Patio in Rancho Del Oro, Oceanside
Oceanside
Paver Patio + Turf Backyard, Mira Mesa San Diego
San Diego
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.