point loma paver pool deck installation

A Loma Portal Pool Deck, Without the Rock Slide

This finished project was a $50k-$60k build.

Project Snapshot

Location Loma Portal, Point Loma, San Diego (92107)
Style Modern
Timeline 55 working days (November 5, 2025 to January 27, 2026)
Price Range $50k-$60k

Angelus Courtyard Combo 60MM pavers, 1,733 sf; NextGel gray polymeric sand; SGW Nature’s Best artificial turf, 130 sf; bullnose step system, 42 lf; 3-inch SDR35 drain line, 50 lf; plastic drain caps, 3.

50 lf of 3-inch SDR35 PVC drain line and three plastic drain caps were included in the project source.

November 5, 2025 to January 27, 2026. 55 working days across a holiday season.

Project Story

Overview

A Point Loma pool kept its perimeter and lost its old rock slide. 1,733 sf of Angelus Courtyard pavers came in around the water, with curved bullnose steps and a small turf accent beside them.

Losing the old rock slide and getting clean pavers around the pool changed how the whole yard feels., Jeremy M., San Diego

The Challenge

  • 1,733 sf of aging pool deck around the pool, with a rock slide in the corner eating real swim room nobody used.
  • The slide had to come out, not be replaced with another water feature, and the deck needed to read as one continuous Angelus Courtyard Combo 60MM surface with 42 lf of bullnose steps.
  • 50 lf of SDR35 drain line had to move water off the deck and away from the foundation without a visible system breaking up the look.

What Changed

1,733 sf of Angelus Courtyard Combo 60MM interlocking pavers, 42 lf of curved bullnose steps, 130 sf of SGW Nature's Best turf, the rock slide removed, and a 50-lf SDR35 drain line tied into the pool-deck grading.

How INSTALL-IT-DIRECT Helped

In Loma Portal, a Point Loma pool had a problem older than the deck. A rock slide had been built into the corner of the coping long enough ago that nobody in the household used it anymore, and it took up almost a quarter of the swimmable perimeter. Once the slide was gone, the deck around it was the next thing to go. Across fifty-five working days through a holiday season, 1,733 square feet of Angelus Courtyard Combo 60mm came in around the water, with curved bullnose steps walking the upper patio down to the new field and a 130-sf turf strip pulled in beside them.

Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.

Design & Build

The Plan

  • Angelus Courtyard Combo 60MM pavers selected to cover 1,733 sf of pool-deck hardscape.

  • Curved bullnose steps (42 lf) built to transition from the upper patio level down to the pool edge.

  • 130 sf SGW Nature’s Best artificial turf insert placed as an accent strip beside the steps and pool perimeter

  • 50-lf 3-inch SDR35 drain line with 3 plastic drain caps routed to carry surface water away from the foundation

  • 9 lf of concrete sawcut included to create a clean transition between the new paver field and the existing slab.

  • NextGel polymeric sand (gray) used throughout to lock joints and resist washout in poolside conditions

See the 2D plan drawing
Project plan

The Build

Demo and Site Prep

The old rock pool slide was demolished and hauled away. Targeted brick, clay tile, and concrete removals prepared the pool deck and adjacent patio areas for new pavers.

Drainage

A 50 lf SDR35 drain line and three plastic drain caps were installed as part of the pool deck drainage scope.

Pavers and Steps

The crew installed 1,733 sf of Angelus Courtyard Combo 60MM pavers across the pool-deck hardscape, plus 42 lf of curved bullnose steps.

Turf Accent

A 130 sf SGW Nature's Best turf accent was installed beside the pool steps with green antimicrobial sand infill.

Investment

What would a similar project cost in San Diego?

Toggle components on/off to estimate your project

Pavers & Base $28,500 – $34,500
Other Materials & Labor $18,500 – $22,000
Steps $2,500 – $3,000
Drainage $500 – $500
Estimated Total

Frequently Asked Questions

Do pool deck projects require permits or HOA review?

Requirements vary by property, jurisdiction, and scope. For pool-deck pavers in San Diego coastal neighborhoods like Loma Portal, verify HOA and city requirements with the relevant authority before scope is finalized.

How long did this Loma Portal pool deck project take?

The project ran from November 5, 2025 to January 27, 2026, 55 working days across a holiday season.

What was included in the pool deck scope?

The documented scope included 1,733 sf of Angelus Courtyard pavers, curved bullnose steps, 130 sf of turf, rock slide demolition, and 50 lf of SDR35 drainage.

Your Outdoor Project in 3 Simple Steps

1

Design

We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.

2

Build

Our experienced crews bring the design to life with premium materials and expert craftsmanship.

3

Enjoy

Step into your transformed outdoor space and start making memories with family and friends.

Your Project Manager

Patrick Diehl

Patrick Diehl

Born and raised in San Diego, Patrick has managed residential, commercial, and high-rise builds, with a specialty in hardscape. A licensed real-estate agent and certified home inspector, he's committed to delivering every project with quality, compliance, and on-time results.

Ready to Transform Your Outdoor Space?

Let's discuss your project and bring your vision to life.