A Hillside Patio with a Fire Feature in Escondido
This finished project was a $32.5k-$37.5k build.
Project Gallery
Transitional side-yard passage in Escondido featuring Angelus Courtyard pavers with soldier-course border and Imperial Coronado Premium turf.
The soldier-course border frames the Angelus Courtyard Combo 60MM pavers through this side-yard run, part of the 752 sf transitional paver installation.
Transitional backyard in Escondido featuring Angelus Courtyard pavers with soldier-course border and Imperial Coronado Premium turf against a panoramic hillside view.
Project Snapshot
Project Story
Overview
Demolished 300 sf of aging concrete and replaced it with 752 sf of Angelus Courtyard Combo 60MM pavers and 692 sf of Imperial Coronado Premium turf in a single Escondido backyard. A 100 lf SDR35 drain line with six drain caps, a gas line for a future fire feature, and a 106 lf rustic paver-on-edge wall finished the conversion from patchy grass to usable outdoor living space.
We left the gas line ready for a fire feature and we end up out there even without it., Michael O., Escondido
The Challenge
- Patchy, bare-dirt grass across the 692 sf now under Imperial Coronado Premium turf, leaving the yard unusable most of the year.
- The aging concrete patio had no SDR35 drainage, water sat against the foundation after rain until 100 lf of drain line and 6 drain caps were added.
- The side yard was overgrown grass and irregular stepping stones with no defined walkway tying front to back of the property.
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Design & Build
The Plan
Angelus Courtyard Combo 60MM pavers in a modular ashlar pattern with a contrasting dark soldier-course border running the patio perimeter and side-yard walkways
Imperial Coronado Premium artificial turf inset as a rectangular island within the paver field, secured with 5-inch and 6-inch nails and filled with Imperial Camofill antimicrobial infill
100 linear feet of 3-inch SDR35 drainline with six drain caps positioned to carry surface water away from the foundation, meeting the requirement for drainage away from structure
19 linear feet of 12-inch-deep trenching for gas line scope, including one 3/4-inch gas sweep, connecting the fire feature to the existing gas supply
106 linear feet of paver-on-edge set in concrete with Weston Wall to create a low rustic perimeter wall
6 linear feet of bullnose steps with riser and tread to transition between grade changes at the patio
See the 2D plan drawing
The Build
Demo and Access
The crew broke out and hauled 300 square feet of existing concrete patio. Side-yard and backyard access staging covered 1,144 square feet. A porta-potty was set on site at site setup.
Grading and Drainage
Subgrade was excavated and compacted across the patio footprint. Nineteen linear feet of 12-inch-deep trenching was completed for the gas line. One hundred linear feet of 3-inch SDR35 drainline was installed with six drain caps, and PVC connections were verified and glued before backfilling.
Base Preparation
Class II road base was spread and compacted to grade with screed rails and grade stakes set to control finished elevations. Drain pipe and conduit sleeve positions were confirmed before the sand bed was screeded.
Paver Installation
Angelus Courtyard Combo 60MM pavers were laid starting from the back of the house and working outward in an ashlar pattern. The soldier-course border was cut and set along all edges. The paver-on-edge rustic wall (106 lf) and bullnose steps (6 lf) were built concurrently. Polymeric sand application was held through two rain events and completed under dry conditions.
Turf and Fire Feature
Imperial Coronado Premium turf was cut and installed into the prepared center island using the zig-zag seam technique. Camofill antimicrobial infill was spread and broomed in. The gas line connection and sweep were completed and inspected before final close-out.
Investment
What would a similar project cost in Escondido?
Toggle components on/off to estimate your project
Frequently Asked Questions
How much does a paver patio with artificial turf cost in Escondido?
A project of this size in Escondido, covering 752 square feet of pavers and 692 square feet of artificial turf with drainage and a fire feature connection, runs in the $32,500 to $37,500 range. Costs vary based on site access, drainage complexity, and material selection. Simpler installs without drainage or a fire feature will come in lower.
Do I need a permit for a paver patio in Escondido?
Standard residential paver patios typically do not require a building permit in Escondido. However, the gas line connection for a fire feature does require a permit under California Plumbing Code Chapter 12. Homeowners should confirm permit status with their sales rep before construction begins.
Can an HOA in California restrict artificial turf?
California Civil Code Section 4735 prohibits HOAs from banning artificial turf. An HOA may set reasonable quality or appearance standards, such as pile height or color, but cannot use those standards to effectively prohibit synthetic grass. Verify current requirements with a licensed contractor or attorney.
Does artificial turf require maintenance after installation?
Imperial Coronado Premium turf needs periodic rinsing to remove dust and debris, and the infill should be brushed up if it becomes matted in high-traffic areas. Unlike natural grass, it needs no mowing, watering, or fertilizing. The antimicrobial Camofill infill used in this project helps control odors in pet-use areas.
How long does a paver and turf backyard project take in Escondido?
This project ran approximately six weeks from the first day of demo through the final walkthrough, including demo, base prep, paver and turf installation, and a gas line connection. Rain delays pushed the polymeric sand application back by a few days. Most projects of this scope take five to seven weeks.
What pavers were used on this Escondido backyard project?
The crew used Angelus Courtyard Combo (Standard) 60MM pavers in an ashlar pattern across 752 square feet. A contrasting dark soldier-course border runs the patio perimeter and side-yard walkways. NextGel gray polymeric sand was swept into the joints after the rainy weather cleared.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
Your Project Manager
Troy MacMillan
A San Diego native with more than 20 years in landscape construction, Troy brings seasoned craftsmanship to every build. A devoted husband and father of two, he carries the same care from the job site to his weekend farm.
More Projects
More from Troy MacMillan
Eastlake Front and Side Yard: Turf, Rock and a Refreshed Planter
Chula Vista
Vista Front Yard with a Putting Green and Belgard Pavers
Vista
Front Yard Pavers, Steps and a Rebuilt Rustic Wall in San Diego
San Diego
Worn Concrete Replaced with Angelus Pavers in San Diego
San Diego
New Paver Patio in Rancho Del Oro, Oceanside
Oceanside
Paver Patio + Turf Backyard, Mira Mesa San Diego
San Diego
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.