Bostonia Backyard Rebuilt in Pavers and Turf, El Cajon
This finished project was a $105k–$128k build.
Project Gallery
Project Snapshot
Project Story
Overview
An El Cajon homeowner in the Bostonia area replaced a drought-stressed lawn and bare dirt backyard with 1,833 square feet of interlocking pavers and 1,765 square feet of artificial turf. The project added Belgard segmental walls, a 300-linear-foot drainage network, 24 path lights, and a gas fire feature across the full lot.
The Challenge
- Multiple low spots across the backyard pooled after rain, leaving the yard unusable for days, the area now drained by this scope's grade work.
- The existing lawn covering the footprint of 1,765 sf of Imperial Desert Rye was patchy, drought-stressed, and largely dead.
- No lighting and no defined patio surface meant no usable evening space before the 1,833 sf Belgard Dimensions 18 patio went in.
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Design & Build
The Plan
Layout: paver field covering 1,833 sf across patio, covered pergola area, driveway approach, and walkways, with two turf infill zones framed by soldier-course paver borders
Pavers: Belgard Dimensions 18 (3-piece set) in custom Montecito color with contrasting soldier-course banding; Laguna Coping in Tan used for 24 lf of step nosing
Walls: Belgard Melville segmental retaining wall (200 sf face, 97 lf concrete footing) with Melville Cap in Graphite/Linen finish (60 lf); walls create raised planting bed zones
Drainage: 300 lf of 3-inch SDR35 drain line with 19 plastic drain caps, wyes, tees, and elbows tied to surface collection points; graded to direct flow away from the structure
Lighting: 24 Pro-Trade PTH1 path lights (15-in. riser, aluminum bronze, 2.5W 2700K LED) on a 300W Pro-Trade TR1 transformer with a smart socket timer; wired with 12/2 low-voltage cable
Gas: 30 lf of 1-inch gas line with 18-inch trench, tracer tape, and two gas line sweeps, installed by a licensed plumber before paver base work began
See the 2D plan drawing
The Build
Demo and Site Prep
Demo began with removal of existing lawn, soil, and surface material across the backyard. A skid steer established rough grades. A damaged gas line found during this phase was repaired by a plumbing subcontractor before any base work resumed. Demo labor totaled approximately 4 hours of focused demolition plus backyard access work across 1,833 sf.
Gas Line and Conduit
The licensed plumber trenched and installed 30 lf of 1-inch gas line with tracer tape and sweep fittings. Concurrently, 60 lf of 1-inch gray conduit was trenched at 18-inch depth for future electrical runs, and a 60-lf water line with spigot was run.
Base Preparation and Drainage
Aggregate base was spread and compacted across the full paver footprint. The 300-lf drain network was installed simultaneously, with 19 collection points, branching wyes and tees, and 5 directional elbows. Concrete footings (12x12 inch, 97 lf) were poured for the Melville wall sections.
Concrete and Sport Court
An 800-sf concrete slab was poured for the multi-use sport court area under the covered patio. Concrete delivery and a custom mold setup were part of this phase.
Paver and Wall Installation
Belgard Dimensions 18 pavers in Montecito color were set across the full 1,833-sf field with soldier-course borders. Melville segmental wall blocks were installed over the concrete footings, capped with 60 lf of Melville Cap. Eight stepping stones were set in concrete, and 24 lf of Laguna Coping formed the step nosings. NextGel Ivory polymeric sand was applied to lock joints.
Turf, Lighting, and final checks
Imperial Desert Rye turf (1,765 sf) was installed in the two infill zones with Camofill infill, seam tape, and weed cloth underneath. The 24 Pro-Trade PTH1 path lights were set and wired to the 300W transformer. Pooling spots identified during inspections were re-graded and repaired. A final on-site inspection confirmed drainage function and closeout items.
Investment
What would a similar project cost in El Cajon?
Toggle components on/off to estimate your project
Frequently Asked Questions
How much does a paver patio installation cost in El Cajon?
A paver patio in El Cajon with a similar scope, 1,800-plus square feet of Belgard Dimensions 18 pavers, segmental walls, turf infill, drainage, and lighting, typically falls in the $116k to $128k range. Smaller patio-only projects in the area run significantly less; cost drivers are total square footage, drainage requirements, and paver color upgrades.
Do I need a permit for a retaining wall in El Cajon or San Diego County?
In the City of San Diego, a building permit is required for any retaining wall exceeding 3 feet in height measured from the top of the footing. If a wall supports a surcharge load such as a driveway or fence, or if tiered walls total more than 6 feet, a permit is also required regardless of individual wall height. This project included a Belgard Melville segmental wall; specific permit requirements were coordinated per site conditions.
Can my HOA prohibit artificial turf in California?
No. California Civil Code Section 4735 makes HOA provisions that prohibit or effectively prohibit artificial turf void and unenforceable. An HOA may set reasonable quality standards such as pile height or color, but it cannot ban synthetic turf outright. As of 2026, the City of El Cajon has not enacted any municipal restriction on artificial turf.
Does artificial turf require maintenance in El Cajon?
Imperial Desert Rye turf needs minimal upkeep compared to a natural lawn. Rinse it down monthly, remove debris with a leaf blower, and brush the fibers upright once or twice a year. The Camofill antimicrobial infill used on this project controls odors without requiring replacement. No irrigation, no mowing, and no re-seeding.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
Your Project Manager
Troy MacMillan
A San Diego native with more than 20 years in landscape construction, Troy brings seasoned craftsmanship to every build. A devoted husband and father of two, he carries the same care from the job site to his weekend farm.
More Projects
More from Troy MacMillan
New Paver Patio in Rancho Del Oro, Oceanside
Oceanside
Paver Patio + Turf Backyard, Mira Mesa San Diego
San Diego
Turf, River Rock & Pavers: Carlsbad Front Yard
Carlsbad
Oceanside Paver Driveway, Turf Grid, and Front Entry Remodel
Oceanside
Mixed Angelus Pavers with Stone Pillars in Vista
Vista
Paver-and-Turf Grid Backyard in Vista
Vista
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.