A 20-Foot Outdoor Kitchen Under a Pergola
This finished project was a $75k-$85k build.
Project Gallery
Finished Belgard Catalina paver patio and turf lawn with the outdoor kitchen and pergola along the back of the yard.
Side-yard paver walkway, capped planter wall, and spa access after the hardscape installation.
Project Snapshot
Project Story
Overview
An inland Carlsbad backyard rebuilt around an existing white pergola: a 20-foot L-shaped outdoor kitchen anchored on the pergola's east post, a natural-gas fire pit six feet south, 1,468 sf of Belgard Catalina Grana paver in Rio, a 286 sf turf inset, and the drainage, gas and conduit no one will ever see.
The Challenge
- The original patio and walkway were smaller concrete surfaces bordered by lawn and planting areas.
- The yard needed drainage and utility routing before the new pavers, turf, fire feature and outdoor kitchen could be finished.
- The cooking area, fire feature, seat wall, turf and side-yard pavers needed to fit around the existing house and shade structure.
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Design & Build
The Plan
1,468 sf Belgard Catalina Grana pavers in Rio color cover the main patio and connected hardscape.
148 sf Belgard Melville segmental wall with Graphite cap defines the seat-wall and planter-wall edges.
286 sf rectangular artificial turf panel bordered by the paver field gives the center yard a clean lawn frame.
Natural gas fire pit finished with black tumbled lava stone, set against the seating zone.
20 ft L-shaped outdoor kitchen with poured concrete counters and appliance cutouts, fed by a trenched gas line and electrical conduit run under the paver base.
SDR35 drainage routed through the field and 17 Pro-Trade ledge lights wired through the wall caps for evening use.
See the 2D plan drawing
The Build
Concrete removal and site prep
The crew removed existing concrete, wall and footing sections, then cleared soil and vegetation from the work areas.
Drainage, gas and conduit routing
Drainline, downspout connections, gas routing and electrical conduit were placed before the finish surfaces went in.
Base preparation and pavers
The patio areas were graded and based, then the Belgard Catalina pavers were installed across the main patio and side-yard areas.
Walls, fire feature and outdoor kitchen
Melville wall material, the natural gas fire pit and the L-shaped outdoor kitchen structure were built into the paver layout.
Turf, lighting and finish work
The final phase added the artificial turf panel, ledge lighting, polymeric sand and concrete counters.
Investment
What would a similar project cost in Carlsbad?
Toggle components on/off to estimate your project
Frequently Asked Questions
How much does a paver patio with an outdoor kitchen cost in Carlsbad?
A similar Carlsbad backyard with pavers, wall work, turf, drainage, a fire feature, gas routing, lighting and a built-in outdoor kitchen would often be planned around this project's $75k-$85k range.
Was drainage part of the backyard design?
Yes. The scope included 92 linear ft total of 3 inch SDR35 drainline and 10 drain caps or downspout connections.
What pavers were used on this Carlsbad backyard project?
The project used 1,468 sq ft of Belgard Catalina Grana Large pavers in Rio color, finished with polymeric sand.
Did this project include artificial turf?
Yes. The backyard includes a 286 sq ft panel of Imperial Desert Rye Premium artificial turf, installed with silica sand and nails.
What utilities were included for the fire pit and outdoor kitchen?
The build included gas routing, gas connections, electrical conduit, low-voltage lighting wire, a transformer and a smart socket timer.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
Your Project Manager
Troy MacMillan
A San Diego native with more than 20 years in landscape construction, Troy brings seasoned craftsmanship to every build. A devoted husband and father of two, he carries the same care from the job site to his weekend farm.
More Projects
More from Troy MacMillan
Turf, River Rock & Pavers: Carlsbad Front Yard
Carlsbad
Oceanside Paver Driveway, Turf Grid, and Front Entry Remodel
Oceanside
Mixed Angelus Pavers with Stone Pillars in Vista
Vista
Paver-and-Turf Grid Backyard in Vista
Vista
From the Front Door to the Pergola, One Paver
San Marcos
Evergreen Front and Back Yards, San Marcos Highlands
San Marcos
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.