Crisp Pavers and Turf in 4S Ranch, San Diego
This finished project was a $47.5k-$52.5k build.
Project Gallery
Completed artificial turf installation across a residential backyard showing a uniform turf field with a defined edge restraint and adjacent decorative river rock. The finished grade ties into the home's exterior and planting beds with exposed soil along the perimeter.
The finished Imperial Desert Rye turf lawn edged by a river-rock border, the hills of 4S Ranch beyond.
Project Snapshot
Project Story
Overview
On a hillside lot in 4S Ranch, the lawn had been failing for years, patchy in winter, brown in summer. When the crew stripped it in late January, they found grubs and beetle larvae in the root mat. Ten working days later, 1,914 sf of Imperial Desert Rye had replaced the lawn and 624 sf of Belgard Moduline 12x24 pavers defined a new patio.
The turf actually stays green now and the patio gives us a flat spot on a hill that never had one., Paul M., San Diego
The Challenge
- The 1,914 sf lawn area now under Pro-Trade Fescue was bare and brown in patches no amount of watering would fix.
- Subsurface grub and beetle larva had destroyed the root system, ruling out regrowth without full removal.
- The existing patio had no unified layout, no border course, no defined edge, so the household had no functional outdoor room to use the hillside view.
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Before & After
Before, the open natural-grass lawn sloping toward the canyon-rim homes.
After, the same yard rebuilt with a large-format paver patio and artificial turf, the same hillside beyond.
Design & Build
The Plan
Layout was staked and string-lined during pre-construction site survey to define patio footprint, turf field boundaries, and river rock bed edges before any demo began.
Belgard Moduline 12×24 pavers in a light field color with contrasting dark segmental paver soldier-course border were selected to create a modern large-format patio with clean geometric framing.
Imperial Desert Rye synthetic turf in Field Green/Lime Blades with Green/Brown thatching was specified for a natural appearance with durability; SGW Envirofill green infill was included for blade support and cooling.
AZ river rock (1/2-inch to 1-inch) with SGW weed cloth barrier was planned for transition beds between turf, pavers, and the perimeter, eliminating ongoing weed maintenance.
A 20-linear-foot concrete wall footing (12×12 inch) with Bastione 24-inch slab steps (30 sf) defines the grade transition between the patio and lower yard areas.
NextGel polymeric gray sand was spec’d to lock paver joints and resist wash-out in the active outdoor environment; a concrete mow strip/paver-on-edge set in concrete runs 102 lf to cleanly separate the turf field from surrounding beds.
See the 2D plan drawing
The Build
Demo and Haul-Away
Crew removed existing natural lawn, roots, bushes, and shrubs. Two large haul-away loads removed the organic debris, including heavily grub-infested soil material. Backyard/pool deck access was used for equipment and material movement throughout.
Grading and Base Preparation
Subgrade was stripped and graded across the turf field and patio footprint. The base was compacted and brought to specified elevations. Wire mesh was staged on-site and laid over the prepared base ahead of turf and paver installation.
Paver Installation
Belgard Moduline 12x24 pavers were delivered and installed across the 624 sf patio and walkway area. The dark soldier-course border was set first to establish the frame, followed by the light field. Concrete wall footing and Bastione slab steps were formed and poured. The side-yard walkway with flanking river rock beds was completed, connecting the front approach to the rear patio. Polymeric sand was swept and activated to lock joints.
Turf Installation
Multiple Pro-Trade Fescue turf rolls were unrolled over the prepared base with black underlayment. Panels were seamed using the zig-zag S-seam technique to minimize visible seam lines. Panels were nailed with 5-inch Imperial 40D nails and filled with SGW Envirofill green 16/30 infill. Metal edging and concrete mow strip defined the turf perimeter.
Landscaping and Finish Work
AZ river rock beds with weed cloth were installed in the designated border areas. One 24x24 box tree and 20 five-gallon plants were installed with top soil. Final site cleanup, staging removal, and completion inspection were conducted to close out the project.
Investment
What would a similar project cost in San Diego?
Toggle components on/off to estimate your project
Frequently Asked Questions
How much does a backyard artificial turf and paver project cost in 4S Ranch?
A project similar to this one in 4S Ranch, combining roughly 1,900 sf of artificial turf with 600 sf of large-format pavers, decorative rock beds, planting, and a low wall, typically falls in the $47,500 to $52,500 range. The main cost drivers are turf square footage, paver material selection, site access, and any grading or HOA coordination required. Projects with simpler scopes or smaller footprints will come in lower.
Can my HOA in 4S Ranch prevent me from installing artificial turf?
Under California Civil Code Section 4735, HOA CC&Rs that prohibit artificial turf are void and unenforceable. Your HOA may set reasonable quality and appearance standards, such as pile height and color requirements, but cannot effectively ban synthetic turf. On this project, HOA approval was required and obtained before construction began, so the process does add lead time even if the outcome is protected by state law. Verify current HOA regulations and legal requirements with a licensed contractor or attorney before proceeding.
What caused the original lawn at this property to fail?
When the crew stripped the existing lawn, they found an extensive infestation of turf grubs and beetle larvae beneath the surface, which had destroyed the root system from below. No amount of watering or overseeding could overcome the subsurface damage. Removing the lawn and replacing it with synthetic turf permanently eliminates the conditions that allowed the infestation to take hold.
How do I maintain artificial turf in San Diego?
The Pro-Trade Fescue turf installed here requires minimal upkeep compared to natural grass. Routine care includes occasional rinsing to remove dust and debris, brushing the blades upright after heavy use, and spot-cleaning as needed. The SGW Envirofill infill used on this project helps blades stand upright and moderates surface temperature. No irrigation, no mowing, no fertilizing, and no re-seeding are required.
How long does a backyard turf and paver installation take in San Diego?
For a project of this size, active construction ran approximately two weeks once demo started. If your property is in an HOA community, build in additional lead time for approval, which in this case added several weeks before a shovel went in the ground. The full timeline from contract to completion was roughly ten weeks, though most of that was pre-construction coordination.
What type of pavers were used for this 4S Ranch backyard patio?
The patio and walkway use Belgard Moduline 12x24-inch pavers in a light field color with a contrasting dark segmental soldier-course border. The large-format size creates a clean modern look with fewer grout lines, and the dark border gives the patio defined geometry. Joints were finished with NextGel gray polymeric sand to resist wash-out and prevent weed intrusion.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
Your Project Manager
Troy MacMillan
A San Diego native with more than 20 years in landscape construction, Troy brings seasoned craftsmanship to every build. A devoted husband and father of two, he carries the same care from the job site to his weekend farm.
More Projects
More from Troy MacMillan
Eastlake Front and Side Yard: Turf, Rock and a Refreshed Planter
Chula Vista
Vista Front Yard with a Putting Green and Belgard Pavers
Vista
Front Yard Pavers, Steps and a Rebuilt Rustic Wall in San Diego
San Diego
Worn Concrete Replaced with Angelus Pavers in San Diego
San Diego
New Paver Patio in Rancho Del Oro, Oceanside
Oceanside
Paver Patio + Turf Backyard, Mira Mesa San Diego
San Diego
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.