Paver Patio, Drainage and Mow Strips in Carmel Valley
This finished project was a $33k-$35k build.
Project Gallery
Where the owners changed their minds: the backyard was drawn in artificial turf and became 337 square feet of tall fescue sod on November 1, ringed by paver on edge set in concrete, with eight new sprinklers under it.
The side yard on November 11: the same Courtyard Combo field and charcoal border carry from the patio past the chimney toward the front.
Project Snapshot
Project Story
Overview
In Carmel Valley 92130 the crew laid 852 square feet of Angelus Courtyard Combo pavers with a charcoal runner border as a backyard patio and a front entry panel, ran 90 feet of 3-inch drain line with 12 drain caps under and around it, set 77 feet of paver mow strip in concrete, built a 46 square foot Angelus Rustic Wall Stone planter wall at the front, and finished the yard with 337 square feet of tall fescue sod and new sprinklers in back and 205 square feet of turf, river rock and beach pebble in front. Demolition started October 31, 2024 and the final payment was collected November 11, two weeks on site. $33K to $35K as built.
The Challenge
- A backyard where the rain collected on the south and west sides, so any new patio needed drains under it, not just a slope.
- A brick curb at the front that left no clean edge between the beds, the lawn and the entry, and valve boxes that could not move out of the new surfaces.
- A plan drawn in artificial turf for the whole yard that the owners changed to a real lawn in back after the first week, with the sprinklers, soil and sod that follow from that.
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Design & Build
The Plan
Patio: 766 sq ft of Angelus Courtyard Combo pavers, Standard finish, 60 mm, in a gray blend with a charcoal runner course as the border, laid from the house to the brick-capped wall at the view fence; 86 sq ft more at the front entry in the same paver.
Drainage: 90 ln ft of 3-inch SDR35 drain line with 12 drain caps and downspout connections under the patio and along the south and west sides where the rain collected.
Edges: 77 ln ft of paver on edge set in concrete as mow strips around the back lawn and the front beds, 20 of them added by change order on October 29 after the brick curb at the front came out.
Wall: 46 sq ft of Angelus Rustic Wall Stone as a planter wall at the front entry, replacing the brick curb.
Back lawn and irrigation: 337 sq ft of tall fescue sod on prepared soil with 3 yards of added soil, 8 pop-up sprinklers on 60 ln ft of 3/4-inch PVC fed from an extended line, and the back fence line converted to drip; added by change order on November 1 in place of the backyard turf.
Front beds: 205 sq ft of Imperial Coronado turf with Camofill infill, 374 sq ft of 3/4 to 1 1/2 inch Arizona river rock, 2 to 3 inch buff beach pebble added November 9, and 22 shrubs.
The Build
Pre-walk and the first change (October 28 to 31)
The contract was signed October 1, 2024, after the owners sent the rep their HOA's approval letter for pavers and turf. The pre-walk was October 28: 817 square feet of pavers, 90 feet of drainage, 57 feet of mow strip, a 46 square foot rustic wall, 22 plants and 542 square feet of turf, with a runner course as the paver border. On October 29 the owners approved a change order for 35 more square feet of pavers, the demolition of the brick curb at the front and 20 more feet of paver on edge in its place. Demolition and the drainage started October 31 with the first progress payment.
Turf becomes lawn, pavers go down (November 1 to 7)
On November 1 the owners switched the backyard from artificial turf to sod and wrote that they wanted more drains on the south and west sides where the rain collects; the change order added 8 pop-up sprinklers on 60 feet of pipe, and the turf order shrank to the front yard. The pavers went down from November 4 and the PM's note that day was that they were looking great. The front wall was finished and the mow strips were in on November 6; the front pavers were finished November 7 with the second progress payment, five yards of soil and 500 square feet of tall fescue sod were ordered that day, and the turf went in at the front.
Rock, sod and close-out (November 8 to 12)
The soil and sod arrived November 8 and the sod went down in the back. On November 9 the owners added 2 to 3 inch buff beach pebble to the front beds by change order, and the rock and planting went in. On November 11 the PM collected the final check and posted the final photos with the note that the clients are in love with their new yard; the certificate of completion was signed November 12 and CIQ marked the job complete the same day. The contract closed at $33.3K after four change orders.
Investment
What would a similar project cost in Carmel Valley?
Toggle components on/off to estimate your project
Frequently Asked Questions
What did this project cost?
$33K to $35K. The contract was signed at $33.9K in October 2024 and four change orders moved it during the build: a small deduction, the extra pavers with the curb demolition and mow strip, the switch from backyard turf to sod with new sprinklers (a net reduction), and the beach pebble. The total as built was $33.3K. The table above groups the 27 priced lines of the project sheet into seven rows; each row holds the sheet figure and the figure scaled to the total, which is why the rows add up to the range shown.
Why is the backyard lawn real grass when the plan said turf?
The owners changed their minds after the first week. On November 1 they switched the backyard from artificial turf to 337 square feet of tall fescue sod, so the crew added 8 pop-up sprinklers on 60 feet of pipe, wheelbarrowed five yards of soil to the back and laid the sod on November 8. The 205 square feet of Imperial Coronado turf stayed in the front yard.
What pavers are these?
Angelus Courtyard Combo in the Standard finish, 60 mm thick, in a gray blend with a charcoal runner course as the border. 852 square feet in all: 766 in the backyard patio and side yard and 86 at the front entry.
How long did it take?
Two weeks on site. Demolition and the drainage started October 31, 2024, the pavers went down from November 4, the front wall and mow strips were done November 6, the sod went in November 8, the rock and planting November 9, and the final payment was collected November 11 with the certificate signed November 12.
Where does the rain go now?
Into 90 linear feet of 3-inch SDR35 drain line with 12 drain caps and downspout connections, laid before the base went in. The owner's note on November 1 asked for drains on the south and west sides where water used to collect, which is where the caps sit.
What is at the front?
A 46 square foot Angelus Rustic Wall Stone planter wall where a brick curb used to be, an 86 square foot panel of the same Courtyard Combo pavers, paver mow strips, 205 square feet of turf, 374 square feet of Arizona river rock, buff beach pebble added on November 9 and 22 shrubs. The valve boxes could not be moved, so they sit in the pavers and turf.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
More Projects
More in Carmel Valley
Outdoor Kitchen, Paver Courtyard and Stucco Walls in Carmel Valley
Carmel Valley
Pool Deck Pavers and Fire Pit, Carmel Valley, San Diego
San Diego
A 16-Foot Outdoor Kitchen and Paver Patio in Carmel Valley
San Diego
Travertine Patio and Fountain, Carmel Valley
San Diego
Pergola, Pool Deck and Stone Fireplace in Torrey Del Mar
San Diego
Modern Family Courtyard in Torrey Del Mar, San Diego
San Diego
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.