A Whole-Yard Santee Transformation: Paver Driveway, Fire Pit & Turf
This finished project was a $160k-$185k build.
Project Gallery
Curb appeal at dusk: an artificial-turf lawn and an Orco Pietra paver driveway lead up to the covered, stone-column entry.
After dusk, low-voltage uplighting picks out the palms along the terraced wall while the covered patio and turf lawn glow under the fans.
The gas fire pit throwing flame after sunset, wrapped by an L-shaped paver seat wall on the Orco Pietra patio.
The fire-pit patio sits a step below the turf lawn, the seat wall doubling as the retaining wall that holds the grade.
Where a bare dirt slope used to be: two courses of segmental retaining wall now terrace the back rise, planted with palms and grasses above a level turf lawn.
Detail of the terraced walls, clean, capped block courses stepping the grade, with low-water grasses and young palms filling the gravel beds between.
The terraced garden from the lawn’s edge, the stepped beds climbing toward the fence line and the neighborhood ridge beyond.
The side yard turned into usable passage: an Orco Pietra walkway with a gravel drainage border running back to a new vinyl gate.
Project Snapshot
Project Story
Overview
Install It Direct completed a $167k Santee whole-yard remodel with 2,060 sq ft of Orco Pietra pavers, 2,240 sq ft of SGW Oceanside Premium turf, drainage, walls, a gas fire pit, patio-cover/electrical work, and planting.
The Challenge
- The front and back yards felt disconnected, with patchy lawn, bare dirt, and walkways that never tied the space together.
- Grade changes made parts of the yard awkward to use and left it prone to runoff when it rained.
- There was no real outdoor living space: nowhere comfortable to gather, sit by a fire, or entertain.
What Changed
How INSTALL-IT-DIRECT Helped
Over 1,000 five-star reviews and 1,500+ San Diego homeowners served.
Before & After
Before: a bare, eroding dirt slope dropping to the back fence.
After: two terraced retaining walls hold the same slope, planted and topped by a level turf lawn.
Before: patchy, dead front lawn and gravel edging along the driveway.
After: artificial turf and an Orco Pietra paver driveway replace the patchy lawn, with a rebuilt covered entry.
Design & Build
The Plan
Use Orco Pietra pavers to connect the driveway, front entry, side access, patio, and backyard hardscape into one consistent surface palette.
Place SGW Oceanside Premium artificial turf in defined lawn panels so the front and backyard stay green without a high-maintenance natural lawn.
Route drainage with SDR35 drainline, French drain, drain/downspout connections, and curb-core work before the finished pavers and turf were installed.
Use retaining and seat walls to organize the backyard grade changes and frame the fire-pit and planting areas.
Coordinate gas, electrical, patio-cover, planting, and finish details so the backyard reads as a complete outdoor-living space.
See the 2D plan drawing
The Build
Demo and Site Prep
Crews removed existing lawn and soil, opened the work areas, and prepared the front, side, and backyard zones for drainage, base, and wall work.
Drainage, Utilities and Base
Drainline, French drain, downspout connections, curb-core work, irrigation, gas-line, footing, and electrical items were coordinated before finished surfaces went in.
Pavers, Walls and Fire Pit
The hardscape phase added Orco Pietra pavers, wall and cap materials, stone veneer, and the gas fire-pit area.
Turf, Rock and Planting
Artificial turf, decorative rock, DG, bender board, shrubs, and trees finished the low-maintenance landscape layout.
Sealer and Finish Work
The final phase focused on paver sealer, lighting and finish details, cleanup, and final finishing work.
Investment
What would a similar project cost in Santee?
Toggle components on/off to estimate your project
Frequently Asked Questions
How much does a full paver, turf, wall, and drainage project cost in Santee?
Whole-yard projects with this much scope usually land in the low- to mid-six figures, and the price moves with square footage, how much wall and drainage work is involved, and the finish level. This Santee project was about $167k and included 2,060 sq ft of pavers, 2,240 sq ft of turf, drainage, walls, planting, a gas fire pit, and patio-cover/electrical coordination.
Do patio covers, fire pits, or retaining walls require permits in Santee?
Permit requirements depend on final dimensions, utilities, attachments, and local review. Verify current requirements with a licensed contractor or attorney before construction. This project included patio-cover footing/electrical items, gas-line work, a fire pit, and retaining-wall related scope.
Should drainage be installed before pavers and turf?
Yes. Drainage should be planned before finished surfaces go in so water can be routed under or around pavers, walls, and turf. This project included SDR35 drainline, French drain, downspout connections, curb-core work, and irrigation items.
How long does a whole-yard paver and turf project take?
Active hardscape and landscape installation on this project ran about 22 working days. The bigger drivers of a whole-yard timeline are scope and weather: drainage and grading go in first, then pavers, walls, turf, and planting, with sealer and patio-cover closeout finishing after the main install. Sequencing the trades this way keeps each one from waiting on the next.
Why combine pavers and artificial turf in the same yard?
Pavers handle driveway, walkway, and patio traffic, while artificial turf keeps lawn areas green with less routine maintenance than natural grass. The combination works best when drainage, borders, walls, and planting beds are planned together.
Your Outdoor Project in 3 Simple Steps
Design
We listen to your vision, assess your space, and create a custom design that fits your lifestyle and budget.
Build
Our experienced crews bring the design to life with premium materials and expert craftsmanship.
Enjoy
Step into your transformed outdoor space and start making memories with family and friends.
Your Project Manager
Chris MacMillan
A San Diego native, Chris grew up in his family's North County landscaping business and went on to launch his own custom outdoor-living company. He combines a finance background with hands-on construction expertise to help homeowners get the most out of San Diego's year-round outdoor living.
More Projects
More from Chris MacMillan
San Diego Backyard Refresh: Turf, Seat Wall and Paver Ribbons
San Diego
Overgrown Escondido Yard Reset with Turf, Beach Pebble and New Planting
Escondido
San Carlos Front Yard with Pavers, Turf and a White Picket Fence
San Diego
Paver Patio, Fire Pit & Outdoor Kitchen in Bonita
Bonita
Pool Deck Pavers and Fire Pit, Carmel Valley, San Diego
San Diego
A Paver-and-Turf Backyard Rebuild in Mira Mesa
San Diego
Ready to Transform Your Outdoor Space?
Let's discuss your project and bring your vision to life.